Equipment Listing

EquipmentQuantity
Hydraulic Power Unit10Ea
20” Power Tong1Ea
13 3/8” Power Tong6Ea
7” Power Tong3Ea
5 ½” Power Tong3Ea
4 ½” Power Tong1Ea
Casing Air Spider Slips with 13 3/8”, 9 5/8”, 7” inserts2 Set
Casing Air Spider Elevator with 13 3/8”, 9 5/8”, 7” inserts2 Set
Tubing Air Spider Slips with 5 1/2”, 4 1/2”, 3 1/2”, 2 7/8”, 2 3/8” inserts2 Set
Tubing Air Spider Elevator with 5 1/2”, 4 1/2”, 3 1/2”, 2 7/8”, 2 3/8” inserts1 Set
Torque Control System Jam Unit3 Set
Fill Up Tools 13 3/8”3
Fill Up Tools 9 5/8”3
Fill Up Tools 7”1

Equipment Specification

1- Hydraulic Power Units

HPUHPUEHPU
Motor TypeDieselDieselElectric
StarterAir/Elec.Air/Elec.Electric
No.of Unitsavailable732
ManufactureFarr CanadaTexas Int. USChina
Manufacture year200820112008
Maximum Operating Pressure (LB)3,000 PSI2,500 PSI
Maximum Flow ((LB)30 GPM @ 1,000 RPM27 GPM at 1000 rpm
Length of tubing on operating reel (ft)60 GPM at maximum speed of 2500 rpm67 GPM at maximum speed of 2500 rpm
Unit Weight (lbs)Dry Weight 4,200 lb.

Full Weight 5121

Dry Weight 3709

Full Weight 4821

Unit dimension L x W x HL: 101 ¾ “  W: 50″  H: 66 ¾”L: 96″  W: 52″  H: 59″

2- Hydraulic Power Tongs

HPTHPTHPTHPTHPT
Size20”13 3/8”7”5 ½”4 ½”
Size range9 5/8″ to 20″7″ to 13-5/8″2.375″ to 8.625″2-1/16″ to 5-1/2″1-3/16″ to 5″
Hydraulic power supply3,000 psi and 60 gpm2,750 psi and 60 gpm2,500 psi and 60 gpm2,500 psi and 60 gpm2,500 psi and 60 gpm
Maximum low gear torque and speed50,000 ft.lb. and 7 rpm35,640 ft.lb. and 10 rpm25,400 ft.lb. and 12 rpm18,894 ft.lb. and 16.1 rpm8,000 ft.lb. at 39 rpm
Maximum high gear torque and speed7,700 ft.lb. and 49 rpm7,130 ft.lb. and 48 rpm5,100 ft.lb. and 58 rpm3,780 ft.lb. and 80.5 rpm4,000 ft.lb. at 76 rpm
Torque handle length52″36″36″36″18″
No.of Unitsavailable16331
ManufactureSARAFARR CanadaFARR

Canada

FARR CanadaFARR Canada
Manufacture year20082011200820112011
Tong Weight (lbs.)3,400 lb.1,550 lb.2,300 lb.1,250 lb.1,000 lb.
Tong dimension L x W x HL: 59 ¼ ” W: 33 “  H: 47”L: 96″  W: 52″  H: 59″L: 54″  W: 30″  H: 49″L: 52″  W: 251/2″  H: 331/4″L: 40 1/8″  W: 29″ H: 54″

3- Casing Air Spider Slips and Elevator

QD 315 PNEUMATIC CASING ELEVATOR/SPIDER
Size range4 ½” to 13 3/8”
Air power supply72-130 psi
Ratedload350 Ton
No. of Units available2 Sets
ManufactureJiangsu Rushi Machinery Co., Ltd.
Manufacture year2008
SpiderWeight (lbs.)16,640 lb.
Dimension L x W x HElevatorL: 52.5″ W: 41″  H: 31.7″
SlipsL: 52.5″ W: 41″H: 34.2″

4- Tubing Air Spider Slips and Elevator

Den-Con TS-150BT-150-TPT
Size range2 3/8” to 5 ½”2 3/8” to 5 ½”
Air power supply72-130 psi72-130 psi
Ratedload150 Ton150 Ton
No. of Units available11+1
ManufactureDen•Con Tool Co.BILCO TOOLS, INC.
Manufacture year20082007
SpiderWeight (lbs.)3,100 lbs5,180 lbs

5- Casing Fill Up Tools

Specialist Drilling Tools Ltd.
Size range13 3/8”9 5/8”7”
Max Working Pressure200020002000
No. of Units available331
ManufactureSpecialist DrillingSpecialist DrillingSpecialist Drilling
Manufacture year200720072007

6- Torque Control System Jam Unit

Connection Technology
No. of Units available3
ManufactureConnection Technology
Manufacture year2007, 2009

Work Experience

1

 

 

 

Client/CompanyBurg El Arab Petroleum Company
Contract Title 3/2007
Start DateFebruary,2008
Finish DateJanuary 6,2012
Scope of Work ( Project Description)Tubular Running Services – (On call out Basis) Contract
LocationEgypt
2Client/CompanyBurg El Arab Petroleum Company
Contract TitleOPS 07/2012
Start DateApril 10,2012
Finish DateApril 09,2014
Scope of Work ( Project Description)Tubular Running Services – (On call out Basis)
LocationEgypt
 
3Client/CompanyKuwait Energy – Egypt
Contract TitleAS/KEE/SAK/011
Start DateDecember 2010
Finish DateDecember 2011
Scope of Work ( Project Description)Tubular Running Services ( On call out Basis) Farm Out Burg elarab
LocationEgypt
4Client/CompanyKuwait Energy – Egypt
Contract TitleKEE – OPS – 2011 – 89
Start DateJuly 10,2011
Finish DateJuly 10 , 2012
Scope of Work ( Project Description)Tubular Running Services  – ( On Call out Basis) Farm Out Burg elarab
LocationEgypt
5

 

 

Client/CompanyKuwait Energy – Egypt
Contract TitleKEE-SAKSON-OPS-S/AA-035-2012
Start DateOctober 15,2012
Finish DateOctober 14,2014 Extended to Oct.2016
Scope of Work ( Project Description)Tubular Running Services  – ( On Call out Basis) Contract
LocationEgypt
6Client/CompanyEnapSipetrol
Contract TitleROM – OP – 15 – A / 2010
Start DateDecember 2010
Finish DateDecember 2012
Scope of Work ( Project Description)Tubular Running Services  – ( On call out Basis) Contract
LocationEgypt
7Client/CompanyVegas Oil & Gas
Contract TitleOP/DR – 24/2009
Start DateJanuary 2010
Finish DateDecember 2012
Scope oof Work  ( Project Description)Fill up & Circulating Tools  ( On Call out Basis) Contract
LocationEgypt
8Client/CompanyAl Hamra Oil Company
Contract TitleOPR # 112-13/2010
Start DateNovember 21,2010
Finish DateNovember 21, 2011
Scope of Work  ( Project Description)Casing Running Services  ( On Call out Basis) Back Up Contract
LocationEgypt
 
9Client/CompanyAl Hamra Oil Company
Contract TitleOPR.# 127 A/2011
Start DateDecember 26,2011
Finish DateDecember 26,2013
Scope of Work (Project Description)Tubular Running Services – (On Call out Basis) Contract
LocationEgypt
10Client/CompanyPetroamir Petroleum Company
Contract TitleOPS 34/2010
Start DateMarch, 2010
Finish DateJanuary, 2012
Scope of Work (Project Description)Tubular Running Services – (On Call out Basis) Contract
LocationEgypt
11Client/CompanyMina Petroleum Company
Contract TitleFarm in – Burg El Arab Contract 3/2007
Start DateApril 1,2010
Finish dateJuly 9,2012
Scope of Work (Project Description)Tubular Running Services – (On Call out Basis)  Farm Out Burg El-Arab
LocationEgypt
12Client/CompanyMarina Petroleum Company
Contract TitleFarm in – Burg El Arab Contract 3/2007
Start DateMay 9,2010
Finish DateJuly 9, 2012
Scope of Work (Project Description)Tubular Running Services – (On Call out Basis) Farm Out Burg El-Arab
LocationEgypt
13Client/CompanyAnwer Al Akkad Sons
Contract TitleFarm in – Burg El Arab Contract 3/2007
Start DateApril 7,2010
Finish DateDecember 30,2012
Scope of Work (Project Description)Tubular Running Services – (On Call out Basis) Farm Out Burg Elarab
LocationEgypt
14Client/CompanyGebel El ziet Petroleum Company – Egypt
Contract TitleFarm in – Burg El Arab Contract 3/2007
Start DateJanuary 1st ,2013
Finish DateJanuary 1st ,2014 Ext. Jan 2015
Scope of Work ( Project Description)Tubular Running Services  – ( On Call out Basis) Farm Out Burg El-Arab
LocationEgypt
15Client/CompanyCanmex Holdings (BERMUDA) II LTD.
Contract TitleCAX/DRILL/CONT/008-2011
Start DateAugust 6,2011
Finish DateAugust 6,2013
Scope of Work (Project Description)Tubular Running Services – (On Call out Basis) Contract
LocationSomalia
16Client/CompanyNew Age (ETHIOPIA) Limited
Contract TitleOnshore Daywork Drilling Contract
Duration1well +1 optional 2013-2014
Scope of WorkTubular Running Services (On call out basis) Contract
LocationEthiopia
17Client/CompanyPetrosannanCompany ( previously “Naftogaz of Ukranie”)
Contract Title1106
Start DateJuly 2010
Finish DateJuly 2012 Ext. to October 2012 to Oct.2013 to Oct.2014 to Oct.2015 to Jan.2016 to April.2016
Scope of Work ( Project Description)Tubular Running Services – (On call out Basis) Extension
LocationEgypt
18Client/CompanyEAST ZIET PETROLEUM Co.
Contract Title21-2555
Start Date20 Feb. 2014
Finish Date19 Feb. 2016
Scope of Work ( Project Description)Tubular Running Services – (On call out Basis) Contract Backup
LocationEgypt