Equipment Listing
Equipment | Quantity |
Coiled tubing unit (ctu) 1 ½ | 3 ea. with average 15,000 fttbg |
Coiled tubing unit (ctu) 1 ¾ | 1 ea. – 16,800 fttbg |
180 K Heat recovery nitrogen pumping skid | 4 ea. |
2000 USGÂ Nitrogen Tanks | 6 ea. |
5500GalNitrogenTanks | 1 ea. |
500 HPâ€HighPressurefluidpump | 4 ea. |
C-Pumps Skid | 2 ea. |
Acid TransferPumps(DelascoPumps) | 2 ea. |
6300USG(150BBL)Storageandmixingtanks | 2 ea. |
10,500USG(250BBL)StorageandmixingTanks | 1 ea. |
1300USGRawAcidStorage tanks | 9 ea. |
BatchMixing(50,100BBL) | 2 ea. |
10 K Quad BOP | 4 ea. |
10 K Dual combi BOP | 2 ea. |
Equipment Specifications
1- CoiledTubing Units
SN.CTU – 1 | SN. CTU – 2 | SN. CTU – 3 | SN. CTU – 4 | |
CT Size | 1 ½ | 1 ¾ | 1 ½ | 1 ½ |
No.of Unitsavailable | 1 | 1 | 1 | 1 |
Manufacture | Hydra-Rig | Hydra-Rig | Mxros-USA | Hydra-Rig |
Manufacture year | 2008 | 2008 | 2011 | 2015 |
Maximum Pull (LB) | 80,000 | 80,000 | 60,000 | 80,000 |
Maximum Snubbing ((LB) | 40,000 | 40,000 | 20,000 | 40,000 |
Length of tubing on operating reel (ft) | 15,935 ft | 16,800 ft | 12,160 ft | 15,000 ft |
Weight of operating reel (ton) | 16.4 | 20 | 11 | 18 |
Reel dimension L x W x H (m) | 4.44 x 2.59 x 3.66 | 4.44 x 2.59 x 3.66 | 3.94 x 2.44 x 2.5 | 4.17 x 2.429 x 1.778 |
Unit | Length cm | Width | Height | Weight kg |
Operator’s Cab | 244 | 244 | 244 | 2,800 |
Power pack | 244 | 213 | 244 | 5,450 |
Injector (680) | 142 | 106 | 226 | 3,720 |
Gooseneck 72†| 95 | 320 | 170 | 364 |
BOP | 193 | 78 | 208 | 2,364 |
Well Control Equipment
Manufacture | Texas oil tools |
BOPs | • 4.06″ 10K EH44 Quad BOP Features : – Light and Com pact – Pressure Balance Piston – Low Bonnet Bolt Torque         – Internal Equalizing Valves – Well Pressure Isolated Seals-  Hydraulic Ram Change – Internal Porting    – Independent Bonnet Testing – No Welds – Solid Body-  Ram Position Indicator – Ram s – Blind, Pipe, Slip, Shear, Shear Seal, Pipe Slip  ·  4.06″, 10K “EH44” Dual Combi BO P ─ 24’ 10 K CB44 lubricator / each package ─ Full set of well head X- over |
Side Door Stripper | 4.06â€Â 10K DSA4 side Door Stripper packer |
Flow Tee | 4 1/16†10K |
2- Nitrogen Equipment
180 K heat recovery nitrogen pumping Skid
SNNU-1 | SNNU-2 | SNNU-3 | SNNU-4 | |
Model | Hydra-Rig | Hydra-Rig | Mxros-USA | Hydra-Rig |
Manufacture Year | 2009 | 2009 | 2011 | 2014 |
Max.InjectionRate(SCF/H) | 180,000 | 180,000 | 90,000 | 180,000 |
Max.Working Pressure(PSI) |
10,000 |
10,000 |
10,000 |
10,000 |
length (m) | 3.4 | 3.4 | 3.4 | 3.4 |
width (m) | 2.4 | 2.4 | 2.4 | 2.4 |
height(m) | 2.54 | 2.54 | 2.54 | 2.54 |
weight(ton) | 7.86 | 7.86 | 7.86 | 7.86 |
Nitrogen Tanks
Unit | Manufacture | Length | Width | Height | Weight K |
6 X 2000 USG LN2 tanks | UBH – UK | 290 | 240 | 250 | 10,480 |
5500 Gal tank | OHS – UK | 340 | 240 | 250 | 21 |
3- Multi – purpose double pump skid
─ Single Pump Skid
Manufacture | Plunger Size | Weight | Length | Width | Height |
Hydra-Rig | 3.5 “ | 11 T | 7.3 m | 1.3 m | 3.35 m |
Hydra-Rig | 4†| 11 T | 7.3 m | 1.3 m | 3.35 m |
─ TriplexPump Rates
0.88 bpm @ 10,400 psi | Maximum flow rate (3.5†plunger) | 8.0 bpm |
1.17 bpm @ 7,958 psi | Maximum flow rate (4†plunger) | 10.5 bpm |
Total | 18.5 bpm |
4- Mixing Equipment
Unit | Length cm | Width | Height | Weight kg |
150 BBl Storage tank | 900 | 230 | 230 | 8,500 |
250 BBL Storage tank | 900 | 250 | 250 | 10,000 |
1300 Gel raw Acid Tank | 200 | 200 | 240 | 6,000 |
100 BBL Batch mixer | 700 | 240 | 300 | 8,500 |
50 BBL Batch mixer | 600 | 220 | 300 | 8,500 |
Dual pod filter unit | 200 | 120 | 230 | 2,000 |
Acid transfer pump | 120 | 100 | 100 | 0.750 |
Work Experience
1 | Client/Company | Sterling Energy |
Contract Title | SEIL/T00-20/09 | |
Start Date | Q2 2010 | |
Finish Date | Q2 2012 | |
Scope of Work | Coiled Tubing & Pumping Services | |
Location | Sangaw, Kurdistan Region, Iraq | |
2
| Client/Company | Burg El Arab Petroleum Company |
Contract Title | Contract No.OP2/2009 | |
Start Date | 1/6/2009 | |
Finish Date | 1/6/2013 | |
Scope of Work | Stimulation & Nitrogen Lifting Services | |
Location | Egypt | |
3 | Client/Company | South Dabaa Petroleum Company |
Contract Title | Contract No.C245/09 | |
Start Date | 27/9/2009 | |
Finish Date | 27/9/2012 | |
Scope of Work | Coiled Tubing, Nitrogen & Stimulation Services | |
Location | Egypt | |
4 | Client/Company | Petro Allam |
Contract Title | Contract No.OPS- 20A/2009 | |
Start Date | 1/12/2009 | |
Finish Date | 1/12/2011 | |
Scope of Work | Coiled Tubing,Nitrogen& Acid Services | |
Location | Egypt | |
5 | Client/Company | Petrosannan |
Contract Title | Contract No.1076 | |
Start Date | 2/5/2010 | |
Finish Date | 2/5/2014 extended to 2/5/2016 | |
Scope of Work | Coiled Tubing, Nitrogen & Pumping | |
Location | Egypt | |
6 | Client/Company | PetroShahd |
Contract Title | Contract No.SHC # 3/2009 ( Backup contract) | |
Start Date | 24/7/2009 | |
Finish Date | 1/9/2013 extended to1/9/2015 to 1/12/2015 | |
Scope of Work | Coiled Tubing & Nitrogen Services | |
Location | Egypt | |
 | ||
7 | Client/Company | Wady El- Sahl Petroleum Company (Farm Out) |
Contract Title | Contract No.OP-12/2009 | |
Start Date | 06-01-09 | |
Finish Date | 1/6/2013 | |
Scope of Work | Stimulation Services | |
Location | Egypt | |
8 | Client/Company | Kuwait Energy Egypt |
Contract Title | Agreement No.EG/AS/10/004 | |
Start Date | 14/4/2012 | |
Finish Date | 14/4/2014 | |
Scope of Work | Stimulation Services | |
Location | Egypt | |
9 | Client/Company | South Dabaa Petroleum company |
Contract Title | Contract no. C319/12 | |
Start Date | 1/6/2012 | |
Finish Date | 1/6/2014 | |
Scope of Work | Coiled Tubing &Nitrogen Services | |
Location | Egypt | |
10 | Client/Company | Dublin Petroleum LTD |
Contract Title | Master Agreement | |
Start Date | 01-03-11 | |
Finish Date | 3/1/2013 | |
Scope of Work | Coiled Tubing, Nitrogen & Stimulation Services | |
Location | Egypt | |
11 | Client/Company | Zeitco |
Contract Title | Contract No.22- 2465 | |
Start Date | 7 June 2012 | |
Finish Date | 6 June 2015 | |
Scope of Work | Coiled Tubing , Nitrogen& pumping Services | |
Location | Egypt | |
12 | Client/Company | Petrosilah |
Contract Title | Contract No.OP-16/2010 B | |
Start Date | 05-09-11 | |
Finish Date | 09-05-15 | |
Scope of Work | Coiled Tubing , Nitrogen Services | |
Location | Egypt | |
13 | Client/Company | Al Hamra Oil |
Contract Title | OPR#118-A/2011 ( Basic Contract) | |
Start Date | 25-08-11 | |
Finish Date | 2014-08-24 extended to 25/8/2016 | |
Scope of Work | Coiled Tubing, Nitrogen & Stimulation | |
Location | Egypt | |
14 | Client/Company | Tanmia / Zeitco |
Contract Title | 22-2465 | |
Start Date | 1-Jun-12 | |
Finish Date | 30 – May -2014 extended to 5/9/2015 | |
Scope of Work | Coiled Tubing, Nitrogen & Pumping | |
Location | Egypt | |
15 | Client/Company | Agiba Petroleum Co.”ENI” |
Contract Title | 4600002176 | |
Start Date | 16-Aug-12 | |
Finish Date | 16-Aug – 2014 extended to 16-Dec- 2015 to 16/3/2016 | |
Scope of Work | Coiled Tubing, Nitrogen & Acid Stimulation | |
Location | Egypt | |
16 | Client/Company | PetroAmir Petroleum Co. |
Contract Title | OPS-203B/2013 (Backup contract) | |
Start Date | 1-Feb-13 | |
Finish Date | 1-Feb-2015 extended to 31/7/2015 | |
Scope of Work | Coiled Tubing, Nitrogen & Pumping | |
Location | Egypt | |
17 | Client/Company | Petroshahd |
Contract Title | SHC # 77/2011Â ( Basic Contract) | |
Start Date | 1-Dec-11 | |
Finish Date | 1-Dec-15 | |
Scope of Work | Coiled Tubing, Nitrogen & Pumping | |
Location | Egypt | |
18 | Client/Company | Schlumberger |
Contract Title | Agreement for Equipment rental & Manpower Services | |
Start Date | 1-May-14 | |
Finish Date | 7/2015 | |
Scope of Work | Equipment rental & Manpower Services | |
Location | Egypt | |
19 | Client/Company | Baker Hughes |
Contract Title | Agreement | |
Start Date | 14 –Sep – 2014 | |
Finish Date | Upon termination | |
Scope of Work | Rental Agreement for coiled tubing | |
Location | Egypt | |
 | ||
20 | Client/Company | Qarun Petroleum Company |
Contract Title | QPC – 11B (14) | |
Start Date | 8-Oct-14 | |
Finish Date | 8-Oct-16 | |
Scope of Work | Coiled Tubing, Nitrogen & Pumping | |
Location | Egypt | |
21 | Client/Company | North Bahariya Petroleum Company ( Norpetco) |
Contract Title | NPC (OPS) – 17/2015 | |
Start Date | 27-Aug-15 | |
Finish Date | 27-Aug-17 | |
Scope of Work | Coiled Tubing, Nitrogen & Stimulation | |
Location | Egypt | |
22 | Client/Company | Tanmia Petroleum Company / Zeitco |
Contract Title | TPC 78 A – (15) | |
Start Date | 23-Nov -2015 | |
Finish Date | 22- Nov-2017 | |
Scope of Work | Coiled Tubing, Nitrogen &Pumping services | |
Location | Egypt | |
23 | Client/Company | South Dabaa Petroleum Company |
Contract Title | C 439/15 | |
Start Date | 1-Jan- 2016 | |
Finish Date | 1-Jan -2018 | |
Scope of Work | Coiled Tubing, Nitrogen & Acidizing services | |
Location | Egypt | |