Equipment Listing

EquipmentQuantity
Coiled tubing unit (ctu) 1 ½3 ea. with average  15,000 fttbg
Coiled tubing unit (ctu) 1 ¾1 ea. – 16,800 fttbg
180 K Heat recovery nitrogen pumping skid4 ea.
2000 USG  Nitrogen Tanks6 ea.
5500GalNitrogenTanks1 ea.
500 HP”HighPressurefluidpump4 ea.
C-Pumps Skid2 ea.
Acid TransferPumps(DelascoPumps)2 ea.
6300USG(150BBL)Storageandmixingtanks2 ea.
10,500USG(250BBL)StorageandmixingTanks1 ea.
1300USGRawAcidStorage tanks9 ea.
BatchMixing(50,100BBL)2 ea.
10 K Quad BOP4 ea.
10 K Dual combi BOP2 ea.

Equipment Specifications

1- CoiledTubing Units

SN.CTU – 1 SN. CTU – 2SN. CTU – 3SN. CTU – 4
CT Size1 ½1 ¾1 ½1 ½
No.of Unitsavailable1111
ManufactureHydra-RigHydra-RigMxros-USAHydra-Rig
Manufacture year2008200820112015
Maximum Pull (LB)80,00080,00060,00080,000
Maximum Snubbing ((LB)40,00040,00020,00040,000
Length of tubing on operating reel (ft)15,935 ft16,800 ft12,160 ft15,000 ft
Weight of operating reel (ton)16.4201118
Reel dimension L x W x H (m)4.44 x 2.59 x 3.664.44 x 2.59 x 3.663.94 x 2.44 x 2.54.17 x 2.429 x 1.778
UnitLength cmWidthHeightWeight kg
Operator’s Cab2442442442,800
Power pack2442132445,450
Injector (680)1421062263,720
Gooseneck 72”95320170364
BOP193782082,364

Well Control Equipment

Manufacture Texas oil tools
BOPs•  4.06″ 10K EH44 Quad BOP

Features :

– Light and Com pact  – Pressure Balance Piston

– Low Bonnet Bolt Torque          – Internal Equalizing Valves

– Well Pressure Isolated Seals-  Hydraulic Ram Change

– Internal Porting    – Independent Bonnet Testing

– No Welds – Solid Body-  Ram Position Indicator

– Ram s – Blind, Pipe, Slip, Shear, Shear Seal, Pipe Slip

 

·   4.06″, 10K “EH44” Dual Combi BO P

─  24’ 10 K CB44 lubricator / each package

─  Full set of well head X- over

Side Door Stripper4.06”  10K DSA4 side Door Stripper packer
Flow Tee 4 1/16” 10K

2- Nitrogen Equipment

180 K heat recovery nitrogen pumping Skid

SNNU-1SNNU-2SNNU-3SNNU-4
ModelHydra-RigHydra-RigMxros-USAHydra-Rig
 

Manufacture Year

 

2009

 

2009

 

2011

 

2014

Max.InjectionRate(SCF/H) 

180,000

 

180,000

 

90,000

 

180,000

 

Max.Working

Pressure(PSI)

 

 

10,000

 

 

10,000

 

 

10,000

 

 

10,000

length (m)3.43.43.43.4
width (m)2.42.42.42.4
height(m)2.542.542.542.54
weight(ton)7.867.867.867.86

Nitrogen Tanks

UnitManufacture LengthWidthHeightWeight K
6 X 2000 USG

LN2 tanks

UBH – UK29024025010,480
5500 Gal tankOHS – UK34024025021

3- Multi – purpose double pump skid

─ Single Pump Skid

ManufacturePlunger SizeWeightLengthWidthHeight
Hydra-Rig3.5 “11 T7.3 m1.3 m3.35 m
Hydra-Rig4”11 T7.3 m1.3 m3.35 m

─ TriplexPump Rates

0.88 bpm @ 10,400 psiMaximum flow rate (3.5” plunger)8.0 bpm
1.17 bpm @ 7,958 psiMaximum flow rate (4” plunger)10.5 bpm
Total 18.5 bpm

 

4- Mixing Equipment

UnitLength cmWidthHeightWeight kg
150 BBl Storage tank9002302308,500
250 BBL Storage tank90025025010,000
1300 Gel raw Acid Tank2002002406,000
100 BBL Batch mixer7002403008,500
50 BBL Batch mixer6002203008,500
Dual pod filter unit2001202302,000
Acid transfer pump1201001000.750

Work Experience

1Client/CompanySterling Energy
Contract TitleSEIL/T00-20/09
Start DateQ2 2010
Finish DateQ2 2012
Scope of WorkCoiled Tubing & Pumping Services
LocationSangaw, Kurdistan Region, Iraq
 
2

 

Client/CompanyBurg El Arab Petroleum Company
Contract TitleContract No.OP2/2009
Start Date1/6/2009
Finish Date1/6/2013
Scope of WorkStimulation & Nitrogen Lifting Services
LocationEgypt
 
3Client/CompanySouth Dabaa Petroleum Company
Contract TitleContract No.C245/09
Start Date27/9/2009
Finish Date27/9/2012
Scope of WorkCoiled Tubing, Nitrogen & Stimulation Services
LocationEgypt
 
4Client/CompanyPetro Allam
Contract TitleContract No.OPS- 20A/2009
Start Date1/12/2009
Finish Date1/12/2011
Scope of WorkCoiled Tubing,Nitrogen& Acid Services
LocationEgypt
 
5Client/CompanyPetrosannan
Contract TitleContract No.1076
Start Date2/5/2010
Finish Date2/5/2014 extended to 2/5/2016
Scope of WorkCoiled Tubing, Nitrogen & Pumping
LocationEgypt
 
6Client/CompanyPetroShahd
Contract TitleContract No.SHC # 3/2009 ( Backup contract)
Start Date24/7/2009
Finish Date1/9/2013 extended to1/9/2015 to 1/12/2015
Scope of WorkCoiled Tubing & Nitrogen Services
LocationEgypt
 
7Client/CompanyWady El- Sahl Petroleum Company (Farm Out)
Contract TitleContract No.OP-12/2009
Start Date06-01-09
Finish Date1/6/2013
Scope of WorkStimulation Services
LocationEgypt
 
8Client/CompanyKuwait Energy Egypt
Contract TitleAgreement No.EG/AS/10/004
Start Date14/4/2012
Finish Date14/4/2014
Scope of WorkStimulation Services
LocationEgypt
 
 

9

Client/CompanySouth Dabaa Petroleum company
Contract TitleContract no. C319/12
Start Date1/6/2012
Finish Date1/6/2014
Scope of WorkCoiled Tubing &Nitrogen Services
LocationEgypt
 
10Client/CompanyDublin Petroleum LTD
Contract TitleMaster Agreement
Start Date01-03-11
Finish Date3/1/2013
Scope of WorkCoiled Tubing, Nitrogen & Stimulation Services
LocationEgypt
 
11Client/CompanyZeitco
Contract TitleContract No.22- 2465
Start Date7 June 2012
Finish Date6 June 2015
Scope of WorkCoiled Tubing , Nitrogen& pumping Services
LocationEgypt
 
12Client/CompanyPetrosilah
Contract TitleContract No.OP-16/2010 B
Start Date05-09-11
Finish Date09-05-15
Scope of WorkCoiled Tubing , Nitrogen Services
LocationEgypt
 
13Client/CompanyAl Hamra Oil
Contract TitleOPR#118-A/2011 ( Basic Contract)
Start Date25-08-11
Finish Date2014-08-24 extended to 25/8/2016
Scope of WorkCoiled Tubing, Nitrogen & Stimulation
LocationEgypt
 
14Client/CompanyTanmia / Zeitco
Contract Title22-2465
Start Date1-Jun-12
Finish Date30 – May -2014 extended to 5/9/2015
Scope of WorkCoiled Tubing, Nitrogen & Pumping
LocationEgypt
 
15Client/CompanyAgiba Petroleum Co.”ENI”
Contract Title4600002176
Start Date16-Aug-12
Finish Date16-Aug – 2014 extended to 16-Dec- 2015 to 16/3/2016
Scope of WorkCoiled Tubing, Nitrogen & Acid Stimulation
LocationEgypt
 
16Client/CompanyPetroAmir Petroleum Co.
Contract TitleOPS-203B/2013 (Backup contract)
Start Date1-Feb-13
Finish Date1-Feb-2015 extended to 31/7/2015
Scope of WorkCoiled Tubing, Nitrogen & Pumping
LocationEgypt
 
17Client/CompanyPetroshahd
Contract TitleSHC # 77/2011  ( Basic Contract)
Start Date1-Dec-11
Finish Date1-Dec-15
Scope of WorkCoiled Tubing, Nitrogen & Pumping
LocationEgypt
 
18Client/CompanySchlumberger
Contract TitleAgreement for Equipment rental & Manpower Services
Start Date1-May-14
Finish Date7/2015
Scope of WorkEquipment rental & Manpower Services
LocationEgypt
 
19Client/CompanyBaker Hughes
Contract TitleAgreement
Start Date14 –Sep – 2014
Finish DateUpon termination
Scope of WorkRental Agreement for coiled tubing
LocationEgypt
 
20Client/CompanyQarun Petroleum Company
Contract TitleQPC – 11B (14)
Start Date8-Oct-14
Finish Date8-Oct-16
Scope of WorkCoiled Tubing, Nitrogen & Pumping
LocationEgypt
 
21Client/CompanyNorth Bahariya Petroleum Company ( Norpetco)
Contract TitleNPC (OPS) – 17/2015
Start Date27-Aug-15
Finish Date27-Aug-17
Scope of WorkCoiled Tubing, Nitrogen & Stimulation
LocationEgypt
 
22Client/CompanyTanmia Petroleum Company / Zeitco
Contract TitleTPC 78 A – (15)
Start Date23-Nov -2015
Finish Date22- Nov-2017
Scope of WorkCoiled Tubing, Nitrogen &Pumping services
LocationEgypt
 
23Client/CompanySouth Dabaa Petroleum Company
Contract TitleC 439/15
Start Date1-Jan- 2016
Finish Date1-Jan -2018
Scope of WorkCoiled Tubing, Nitrogen & Acidizing services
LocationEgypt